This diagram shows the connection ofthe AMETEK Latching Relay with BMS123.
The relay is controlled bythe BMS123 Load Relay NC contact. The auxiliary relay is powered by the DC main voltage and it will create the impulse signal for the latching relay to disconnect.
Since the main
comes with the TTL communication port that allows reading the data of the BC in a digital way.
Please see the photos of the connection of the communication cable. Check more at ELERIX GitHub –
The TTL-232 to USB converterthat has been tested by GWL –
Check this Youtube video to see how to install theGWL/Modular BMS Basic into a 24V battery pack.
Check these main components used in the set-up:
ELERIX 110 Ah
ELERIX battery holder
GWL/Modular BMS Basic
Safety is the most important factor of any DC powered installation. To help you with the instant safety, GWL supplies the quality circuit-breakers that can be used for your installation. The 125Amp DC Breaker is designed to protect the main DC line while the 32Amp and 2AMp models are designed fo
Question: I have the CPM board and I wish to read the data from the board to make the analysis of the battery pack. How to do it?
If you havethe CPM v 1.8(sold for the last 1 year and more), you can connect the BCC board to the CPM to read the data and to transfer them via the computer
The CPM board is designed to provide a direct support of the high-power control by means of the latching relays.
Check the drawing and seethe function of the individual componentsas a part of the.
Thefor the protection of the battery.
The EX-L12V100R Service Connector is a magnetic 5-pin connector that allows direct access to the individual cells of the 12V battery.
The function of the connector is following
How to use with or ?
Our tech department preparedfor you a nice and simple schema:
You can preview the images or download the PDFs here: &
1) Battery monitoring
The CPM1 serves as the battery monitoring device.
2) Flexible connection to each cell in the battery
The cells can be disconnected completely and easily. In this example the disconnection is done by means of the Battery link cable
A simple solution for quick and easy assembly of the battery packs. The 8 cells can be assembled into a 6V (4P2S), 12V (2P4S) or 24V (8S) configuration.
The GWL/Modular solution is equipped with the BMS Basic for protection and management of the installation.