Blog - Elerix

ELERIX EX-S5 Cable for Victron Cerbo GX

To connect the ELERIX EX-S5 with Victron Cerbo GX, there is a need for a special cable.

This cable can be purchased on-line. You can also study the support information and get more details about the CAN connectors pin outs and how to make this cable.

Check more links:

01.Nov 2022
| Blog - Elerix

Quick and Easy - The magnetic 5 pole connector

is designed to be used a service connector for a 5-pin wiring. This means it can be used to transfer 4 signals and one common ground.

For DC application this service connector is purposedto be used for a quick connection to 12V battery banks o

31.Oct 2022
| Blog - Elerix

ELERIX 12V Battery Packs

Check the offer for the

An easy solution for a 12V lead-acid battery replacement.

Check additional accessories:

… more to come

18.Oct 2022
| Blog - Elerix

ELERIX EX-L100EU Lithium Cell - Made in EU

GWL is happy to introduce theELERIX EX-L100EU cell. It is theMade in EUlithium iron phosphate cell.

Unlike some other“dream stage product” and“investor money tunnels”, this LFP cell is ready for order, right now and here.

Long live ELERIX

17.Oct 2022
| Blog - Elerix

TEST REPORT: Low Temperature Performance of the LTO Cells

Check the Test Report for the ELERIX EX-T30K LTO cells that shows the performance of the cells at +25°C and also and -25°C.

This test confirms the excellent energy storage capacity for the LTO cells even in the low temperature conditions.

The results show that even under -25°C the LTO cell pro

11.Oct 2022
| Blog - Elerix

ELERIX 3D STL files at GITHUB

The improved version of GITHUB allows a direct viewing of the STL files with the 3-dimensional model of the ELERIX cells.

Check directly theELERIX cell models at the GITHUB site:

More about

26.Sep 2022
| Blog - Elerix

FAQ: Will the panels from GWL really work for 30+ years?

Answer:GWL team is definitely sure the solar panelswill work for at least 30 years, perhaps even for 40, 50 or even more years.

The solar panels supplied by GWL are manufactured by the latest technology standards and methods.

The oldest customers of GWL have installed solar panels in 200

19.Sep 2022
| Blog - Elerix

FAQ: The performance of the lead-acid cells in cold and...

The winter of 2022-2023 is coming in just a few months and many customers wonder aboutthe performance of their battery packs. Especially those who have been using the lead-acid batteries.

The performance of the lead-acid batteries drops significantly in sub-zero temperatures.The above diagr

23.Aug 2022
| Blog - Elerix

FAQ: Voltage level for the LTO cells

Question:Concerning the LTO cells, I can see that some information mentions the nominal voltage at 2.3V some other datasheets say 2.4V. I wonder what is the nominal voltage of the 5-cell pack: 11.5V or 12V?

Answer: both versions of the information are correct. The reason is that the disc

23.Aug 2022
| Blog - Elerix

GWL (as AMVOLT) at Intersolar 2022 - B2 175

GWL was present at Intersolar again - after the“pause” of 2018, 2019, 2020, 2021.

Our booth was presented under the AMVOLT brand at Smarter E Europe (Intersolar Europe, ees Europe, Power2Drive Europe and EM-Power Europe).

AMVOLT is a division of GWL a.s. and manufactures

04.Aug 2022
| Blog - Elerix
23 visitors online.
All Rights reserved © 2024 GWL Group a.s. - GShop v. 1.4.8