One of the main advantages of theGWL/Modular solution is that it comes with a complete set of documentation. The goal of this concept is that the product is fully replicable and serviceable at any location of the world by the local skilled electricians.
This is the difference between the Modular –
The video from the installation of the 48 pieces of. The total of15.8 kWpon the roof.
Enjoy!
The GWL/Power team is also experimenting withthe energy generation from heat by a Stirling motor. The Stirling motor is installed on top of the OKOFEN Power-generating pellet boiler.
The demonstration shows the real power from the1000W Stirling Motor generation. The output power rated at the AC part of the
“The Bestie” is the“Beast” and it is the “Best of the Beasts”. Actually this is the very first photo of the GWL/Modular complete solution, to be installed in the Czech Sustainable Houses project, after it has arrived to GWL/Warehouse in mid summer 2020.
This
The photos of the testing installation of the Czech Sustainable Houses project. The GWL/team has installed the the DC/AC power switch box. The initial testing was performed at GWL’s warehouse.. You may check.
Few more photos of the progress on the first of the Czech Sustainable Houses. The roof timbers are going up and soon the whole raw structure will be accomplished.
In the meantime, we are working on a small Sustainable Garden project. A Sustainable house also needs a sustainable gard
Is GWL a construction project company? Perhaps, we will be in the future. GWL is actively supporting theCzech Sustainable Houses (CSoD) project. These photos show the progress of the first 100% Off-grid house, under construction from 11/2019 till now 3/2020.
More details to follow.