Blog

GWL/Modular 4S Balancing Boards

New product to make the life easier: Balancing board for 1~4 cells LFP (1.2 Amp)

Simple balancing board for 1S to 4S LFP cells. Connection by means of wires. Indication of the balancing by LED diodes. This balancing board can be used to balance LFP cells during the final part of t

03.May 2021
| Blog

The New Generation of Copper Terminals

GWL/Poweris introducing a new generation of thehigh flexible copper terminal connectors(also called bus bars). The new generation is made from multilayer copper belts with nickeled surface.

More details coming quickly…

03.May 2021
| Blog

ELERIX High Performance Cells

The pre-production samples of theELERIX high performance LFP and LTO cells.

They are coming to you… soon.

03.May 2021
| Blog

ELERIX EX-S5

All in one – One in All – You Power the Life This is the philosophical slogan of the ELERIX STORAGE 5 - EX-S5 – 48V 5kWh energy storage module.

Simple, easy, quick, complete – all of these words describe the ELERIX STORAGE 5 - EX-S5.

More details to come soon.

03.May 2021
| Blog

GWL/Modular Balancing Rail in action

Balancing rail is a setup of 8 balancing resistors connected to the metallic rail-holder.

Each resistor is a20W, 0.68Ohm ceramic model. With balancing voltage of3.65Vit will pass through the current of5.36Amp, releasing some19.6Wof heat.

The metallic rail al

12.Apr 2021
| Blog

The innovative ELERIX cells 50AH and 110AH

The innovative ELERIX brand cells are coming. It is a long way for a product to make it through the product development, product review, testing, evaluating, reviewing, branding…

Until the product is ready on stock to be sold in mass quantities.

Stay in touch for more details

12.Apr 2021
| Blog

Standards for 24V, 48V and 80V forklift batteries

GWL is now working on the delivery of the high capacity industrial batteries for forklifts and heavy machinery.

All batteries provided by GWL are based on the safe and risk free lithium technology.The construction design follow the DIN 43525, DIN 43531 and DIN 43536 requirements.

For 24V batteries&nb

12.Apr 2021
| Blog

GWL/Blog: readily assisting you - since 2009

The GWL/Blog has. Duringthe 11+ yearswe have published more than 2100 posts and articles.

More to come. Happy Easter 2021!

06.Apr 2021
| Blog

High quality battery packs with a modular set-up

This photo showsthe test installation for a high-performance quality pack using the ELERIX 50AH cells.The two cells are installed in parallel to reach the 100AH capacity. The massive copper terminal platesmake sure there will be a minimal loss of the energy during the peak discharge

06.Apr 2021
| Blog

Flexible terminal connectors

Can the terminal connectors be improved? GWL/Team is making these even more flexible.

The newELERIX Brand of productscomes with new innovative terminal connectors.

More to come soon.

31.Mar 2021
| Blog
24 visitors online.
All Rights reserved © 2021 GWL a.s. - GShop v. 1.4.6